Plumbing Rough-In (Top-Out) Inspection

Updated Mar 26, 2026
Above-slab plumbing inspection: pipe sizes, venting, trap arm lengths, fixture unit calculations, water hammer arrestors, expansion tanks, and proper support. Air test at 5 psi for 15 minutes.
TAGS
plumbingrough-inventingtraptest
DETAILS
test
Air test 5 psi / 15 min
timing
After top-out, before close-in
category
Plumbing
RELATED KNOWLEDGE
📋 Code
IBC Section 1107 — Accessible Unit and Dwelling Unit Elements
Requires accessible common use elements within individual residential units.
📋 Code
IECC Section 603 — Energy Cost Budget Method
Provides performance-based alternative to prescriptive energy code requirements.
🔍 Inspection
Framing Inspection Protocol — What Inspectors Actually Check
Inspector verifies: correct lumber grades, nailing schedule per plans, holdown/strap installation, fire blocking, shear wall nailing, header sizes, bearing points, bracing. Most common fails: missing holdowns, wrong nailing.
🔍 Inspection
Rough Electrical Inspection — What Inspectors Actually Check
Inspector verifies: wire sizing per circuit, GFCI/AFCI locations, box fill calculations, grounding/bonding, nail plates, smoke detector wiring. Must pass before insulation. Common fails: missing GFCI, wrong wire gauge.
📋 Code
NFPA 99 — Health Care Facilities Code
Comprehensive code for safety systems in hospitals and medical facilities.
🌿 certification
Fire Protection Engineer (FPE) Certification
Advanced certification for engineers specializing in fire safety systems.
← Back to Knowledge Garden