HomeKnowledgeNEC 2023 Article 250 — Grounding and Bonding
📋 Codeconstruction

NEC 2023 Article 250 — Grounding and Bonding

Updated Apr 17, 2026
System and equipment grounding. Main bonding jumper in service panel. Separately derived systems need grounding electrode. Grounding electrode conductor sized per Table 250.66.

Common residential mistake: neutral-ground bond on subpanel. Must be bonded only at service equipment per 250.142.

TAGS
electricalnec-2023groundingbonding
DETAILS
section
Article 250
category
Electrical — Grounding
code body
NEC
code year
2023
adopted by
["ca-la","ca-sf","ca-sd","az-phx","nv-lv"]
source url
https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70
SOURCES
🔗https://www.nfpa.org/codes-and-standards/all-codes-and-stand...
RELATED KNOWLEDGE
📋 Code
IMC Chapter 7: Combustion Air
Technical requirements for imc chapter 7: combustion air.
📋 Code
IMC Chapter 10 — Boilers, Water Heaters, Pressure Vessels
Boiler rooms, clearances, T&P relief valves, expansion tanks, combustion air requirements.
📋 Code
IMC Chapter 5: Exhaust Systems
Technical requirements for imc chapter 5: exhaust systems.
📋 Code
IMC Chapter 6: Duct Systems
Technical requirements for imc chapter 6: duct systems.
📋 Code
IMC Chapter 11: Hydronic Piping
Technical requirements for imc chapter 11: hydronic piping.
📋 Code
IMC Chapter 8: Chimneys and Vents
Technical requirements for imc chapter 8: chimneys and vents.
← Back to Knowledge Garden