🔗 Sequenceconstruction

Project Closeout Sequence

Updated Mar 26, 2026
Closeout sequence: 1) Substantial completion punch list, 2) Final inspections (building, fire, health), 3) Certificate of Occupancy, 4) Owner training on systems, 5) As-built documents, 6) Warranty packages, 7) Final payment, 8) Lien waivers, 9) Project archive.
TAGS
closeoutpunch-listCOwarrantyinspection
DETAILS
phase
DELIVER
category
Closeout
successor
Occupancy + warranty period
predecessor
All work complete + final cleaning
critical holds
["Final building inspection","Fire marshal inspection","CO issued"]
RELATED KNOWLEDGE
🔗 Sequence
Foundation → Framing Sequence (Hold Point: Foundation Inspection)
Framing cannot begin until foundation inspection passes. Concrete must achieve minimum 75% design strength before loading. Foundation inspection is a hard hold point in every jurisdiction.
🔗 Sequence
Rough MEP → Insulation Sequence (Hold Point: Rough-In Inspection)
Insulation and drywall cannot begin until rough mechanical, electrical, and plumbing inspections pass. All three trades must complete rough-in and be inspected before walls can be closed.
📋 Code
IBC Section 1107 — Accessible Unit and Dwelling Unit Elements
Requires accessible common use elements within individual residential units.
📋 Code
IECC Section 603 — Energy Cost Budget Method
Provides performance-based alternative to prescriptive energy code requirements.
🔗 Sequence
Drywall → Paint/Finishes Sequence
After drywall hung and taped: prime, texture, paint. Flooring after paint (or protect if before). Cabinets after drywall, before countertops. Trim/millwork after paint. Final clean before CO inspection.