Data Center

Updated Mar 25, 2026
Mission-critical facility housing computing equipment. Tier I-IV classifications per Uptime Institute. Requires redundant power (N+1/2N), precision cooling, raised floors, fire suppression (clean agent), physical security, and commissioning. $52B+ US market 2026.
TAGS
data-centermission-criticalTier-classificationcoolingpower
DETAILS
category
Mission Critical
key codes
IBC, NFPA 75, NFPA 76, ASHRAE TC 9.9
typical cost per sf
$800-$2,500
construction timeline
18-36 months
RELATED KNOWLEDGE
📋 Code
IBC Section 1107 — Accessible Unit and Dwelling Unit Elements
Requires accessible common use elements within individual residential units.
📋 Code
IECC Section 603 — Energy Cost Budget Method
Provides performance-based alternative to prescriptive energy code requirements.
📋 Code
NFPA 99 — Health Care Facilities Code
Comprehensive code for safety systems in hospitals and medical facilities.
🌿 certification
Fire Protection Engineer (FPE) Certification
Advanced certification for engineers specializing in fire safety systems.
🌿 sustainability
LEED v4.1 Materials & Resources Credits
Credits for sustainable material sourcing and waste reduction during construction.
📋 Code
NFPA 72 Manual Fire Alarm Pull Stations
Specifies location, height, and labeling of manual fire alarm activation devices.
← Back to Knowledge Garden