Concrete Pre-Pour Inspection

Updated Mar 25, 2026
Inspection before concrete: formwork, rebar, embedded items, site conditions.

Checks: forms aligned/braced, rebar size/spacing/cover correct, anchor bolts placed, subgrade compacted, no water. HOLD POINT: no concrete until passed.

TAGS
inspectionconcretepre-pourreinforcement
DETAILS
hold point
true
RELATED KNOWLEDGE
🔍 Inspection
Framing Inspection Protocol — What Inspectors Actually Check
Inspector verifies: correct lumber grades, nailing schedule per plans, holdown/strap installation, fire blocking, shear wall nailing, header sizes, bearing points, bracing. Most common fails: missing holdowns, wrong nailing.
🔍 Inspection
Rough Electrical Inspection — What Inspectors Actually Check
Inspector verifies: wire sizing per circuit, GFCI/AFCI locations, box fill calculations, grounding/bonding, nail plates, smoke detector wiring. Must pass before insulation. Common fails: missing GFCI, wrong wire gauge.
🔍 Inspection
Foundation Inspection
Pre-pour inspection verifying footing dimensions, rebar placement, form alignment, soil bearing, and drainage.
🔍 Inspection
Final Inspection / Certificate of Occupancy
Final inspection before building occupancy. All systems operational, life-safety features verified.
🔍 Inspection
Underground/Slab Plumbing Inspection
Pre-slab inspection of below-grade plumbing: building drain, waste, vent stubs, cleanouts, test.
🔍 Inspection
MEP Rough-In Inspection
Multi-trade inspection after rough plumbing, electrical, and HVAC but before insulation/drywall.
← Back to Knowledge Garden