Home
›
Knowledge
›
Stormwater/NPDES Permit
📄 Permit
construction
Stormwater/NPDES Permit
Updated Mar 26, 2026
📋 Share Link
National Pollutant Discharge Elimination System permit for construction sites disturbing 1+ acres. Requires Stormwater Pollution Prevention Plan (SWPPP), erosion controls, silt fencing, stabilization, and regular inspections during construction.
TAGS
stormwater
NPDES
SWPPP
erosion
environmental
DETAILS
trigger
1 acre disturbance
category
Environmental
required docs
SWPPP, NOI
jurisdiction type
State environmental agency / EPA
RELATED KNOWLEDGE
📋 Code
IBC Section 1107 — Accessible Unit and Dwelling Unit Elements
Requires accessible common use elements within individual residential units.
📄 Permit
Building Permit — Los Angeles (LADBS)
Required for all new construction, additions, alterations, and repairs in Los Angeles. Issued by LA Dept of Building & Safety. Plan check: 15-45 days standard, expedited available.
📋 Code
IECC Section 603 — Energy Cost Budget Method
Provides performance-based alternative to prescriptive energy code requirements.
📄 Permit
Building Permit — New York City (DOB)
Required for all construction in NYC 5 boroughs. Filed with NYC Department of Buildings. Professional certification (PE/RA) required for most work. Plan examination or professional certification track.
📄 Permit
Electrical Permit — General Requirements (Most US Jurisdictions)
Required for all new electrical work, service upgrades, panel replacements, and additions. Must be pulled by licensed electrician or homeowner (where allowed). Requires rough and final inspections.
📋 Code
NFPA 99 — Health Care Facilities Code
Comprehensive code for safety systems in hospitals and medical facilities.
← Back to Knowledge Garden