NEC 250 — Grounding and Bonding

Updated May 22, 2026
Governs grounding electrode system, equipment grounding conductor sizing, and bonding requirements at the service. Required for every panel schedule.

Tom-the-MEP cited grounding as a frequent panel-schedule line item that LLMs get wrong. The panel-schedule UI flags grounding as a follow-up — engineer of record must size GEC + EGC per 250.66 / 250.122 against the service rating and the breaker, respectively.

TAGS
NEC250groundingbondingGECEGCservice-grounding
DETAILS
book
NEC 2023
section
250
mep calc workflow
q-panel-schedule
SOURCES
🔗https://codes.iccsafe.org/content/NFPA702023/article-250
RELATED KNOWLEDGE
🌿 code_section
IFC 903 — Automatic Sprinkler Systems
When sprinklers are required by occupancy classification, fire area, height, and water-supply availability. Triggers NFPA 13/13R/13D design.
🌿 code_section
NEC 220.83 — Existing Dwelling Optional Calculation
Alternative load-calc method for existing single dwelling units: first 8 kVA of all loads at 100%, remainder at 40%, plus A/C at 100%.
🌿 code_section
NEC 240.4 — Conductor Overcurrent Protection
Conductors must be protected at their ampacity. 240.4(D) small-conductor rule: 14 AWG max 15A, 12 AWG max 20A, 10 AWG max 30A.
🌿 code_section
UPC 422.1 — Minimum Plumbing Fixture Count
Required number of water closets, lavatories, urinals, drinking fountains, and service sinks by occupancy and occupant load.
🌿 code_section
NEC 220.12 — General Lighting Load by Occupancy
VA-per-square-foot table used as the base general-lighting load in any service-load calc. Office 3.5, dwelling 3.0, restaurant 2.0, warehouse 0.25.
🌿 code_section
CMC 403 / ASHRAE 62.1 — Ventilation Rates for Acceptable IAQ
Outdoor air ventilation rates by occupancy (CFM per person + CFM per sqft). Office 5 + 0.06, retail 7.5 + 0.06, restaurant dining 7.5 + 0.18, etc.