Tom-the-MEP cited grounding as a frequent panel-schedule line item that LLMs get wrong. The panel-schedule UI flags grounding as a follow-up — engineer of record must size GEC + EGC per 250.66 / 250.122 against the service rating and the breaker, respectively.